AI-Powered Battery Energy Storage System (BESS) + EasiEMS Pro
Paving the Way to Green Building Certification (GBI/GreenRE/LEED) REQUEST FOR DEMO

AI-Powered Battery Energy Storage System (BESS) + EasiEMS Pro

Don’t just store energy.
Make every kW earn its keep.

Most BESS units sit idle, discharging only after a spike has already been recorded. Tanand’s AI-Powered BESS + EasiEMS Pro predicts and prevents demand spikes — slashing your TNB Maximum Demand bill every month, measurable.

Up to 30%

TNB MD reduction with BESS + AI Control

RM473K

Annual savings potential at 400kW MD reduction

Less than 3.5 yrs

Typical ROI with performance guarantee

The Real Problem

Other BESS sellers give you hardware.
We give you attractive savings. 

The difference between a smart BESS investment and an expensive battery in your plant room is intelligence.

✕  Typical BESS Seller
  • Battery reacts after a spike — TNB has already recorded your MD for the month
  • Fixed discharge threshold — misses your variable daily load patterns
  • Battery depletes mid-peak, leaving you exposed at the worst moment
  • No visibility into which machines actually cause your spikes
  • You own all hardware risk — savings are never guaranteed

✓   Tanand BESS + EasiEMS Pro

  • AI predicts MD 1–30 min ahead — BESS discharges before TNB records the spike
  • Dynamic setpoints adapt to your actual plant load pattern
  • Smart SoC management ensures battery is always ready at peak moments
  • Sub-meter visibility to machine level — know exactly what drives your peaks
  • Performance-measurable subscription — we share the risk, you measure savings

How It Works

Four steps running automatically, 24 / 7

EasiEMS Pro acts like a highly trained demand manager — always watching, always optimising, never off-duty.

01.  Predict

AI Load Forecast

Neural network ingests 90–180 days of load history, real-time meter data, and production schedules to forecast MD 1–30 min ahead.

02.  Decide

Smart Ceiling Set 

EMS calculates an optimal setpoint balancing MD target, battery SoC, depth of discharge, recharge window, and TNB tariff bands.

03.  Act

BESS Discharges 

Battery discharges precisely — only when grid demand would breach your ceiling. Production continues with zero manual intervention.

04.  Learn

Daily Self-tuning 

The model retrains daily on actual vs. predicted data, continuously improving accuracy and ensuring stable savings month over month.

*Result: Up to 30% MD reduction · Battery never runs empty during peak · Stable, repeatable savings month after month

Solution Tiers

Choose your level of demand control 

Start with monitoring, scale up to full BESS integration — or go straight to the complete solution.

Savings Potential

TNB MD Reduction — What it means in Ringgit 

Based on TNB tariff: RM98.61/kW (Capacity + Network charges combined)

MD Reduction Monthly Saving (RM) Annual Saving (RM 10-Year Value (RM)
100 kW RM 9,861 RM 118,332 RM 1.18M
200 kW RM 19,722 RM 236,664 RM 2.37M
300 kW RM 29,583 RM 354,996 RM 3.55M
400 kW RM 39,444 RM 473,328 RM 4.73M
500 kW RM 49,305 RM 591,660 RM 5.92M

*Actual client result: 554kW MD reduction achieved with EasiEMS Pro = RM54,630 monthly saving = RM655,560 per year

Project Delivery Assurance

AI brains. Decades of engineering muscle. 

Tanand’s AI expertise is backed by a formal collaboration with Maju Antara Sdn Bhd — a CIDB-certified, MOF-registered EPCC company established in 1979.

TANAND TECHNOLOGY BRINGS 

AI intelligence & hardware 

  • EasiEMS Pro AI demand prediction platform
  • BESS cabinet (125kW/261kWh, scalable to 750kW/1,560kWh)
  • Tier 1 LFP cells with 10-year manufacturer warranty
  • Ongoing cloud monitoring & AI optimisation (24/7)
  • Performance measurable on MD savings delivered

MAJU ANTARA SDN BHD BRINGS 

EPCC execution & compliance 

  • Full turnkey engineering, procurement & construction
  • Site survey, civil works & electrical installation
  • Testing, commissioning & regulatory submission (CIDB, JKKP)
  • In-house service & maintenance team (on-site / remote)
  • MOF-registered & CIDB-approved — established 1979

Addressing Your Concerns

Common questions answered — honestly. 

Yes. Maju Antara’s CIDB-certified engineering team has executed complex industrial EPCC projects since 1979 — from full rice mill plants and biomass boiler systems to complete factory process automation. BESS installation is well within their scope.

Maju Antara is MOF-registered and CIDB-approved (certification valid to 2028), with established financial credentials for government-linked and large corporate project tenders — enabling joint bids with confidence.

Maju Antara provides a dedicated in-house service & maintenance team covering both on-site and remote support. Tanand simultaneously provides 24/7 cloud monitoring, AI performance tracking, and remote diagnostics — complete coverage.

The EasiEMS Pro BESS AI Optimizer tier comes with measurable performance. Savings are measured, monitored, and reported monthly. We share the risk — if the MD target isn’t hit, the model adjusts accordingly.

Proven Results

Real savings from real deployments

554 kW

MD reduction — one client
(3,070 → 2,516 kW achieved)

RM54,630

Monthly MD cost saving from single EasiEMS Pro deployment

45,000 kWh

Energy saved/month at semiconductor manufacturer (AI-optimised HVAC, 35% reduction)

4,000+

IoT devices deployed across 40+ projects in 5 sectors

35%

Average energy reduction at semiconductor manufacturer

8,000+

Battery cycle life (LFP, 95% DoD) >20 years at 1 cycle/day

BESS Technical Specifications

All-in-one Liquid Cooled ESS Cabinet — 125kW / 261kWh

Cell Type LFP 314Ah — BNEF Tier 1, Top 5 ESS Cell Manufacturer
Battery System 261.24kWh / 1P260S · Voltage Range: 728–936Vdc
Rated Power (AC) 125kW · Max 137kW · THDi ≤3%
Nominal Voltage 400Vac / 3P+N+PE · Power Factor: 0.98 lag–lead
Efficiency ≥90% · Charge/Discharge Rate: 0.5C
Depth of Discharge 95% (25±2°C) · Cycle Life: ≥8,000 cycles
Connectivity Ethernet / RS485 / Modbus TCP
Cooling Active liquid cooling · Operating: -25 to 55°C
Fire Safety Aerosol + BMS Active Protection · UL9540A certified
Dimensions 1,050 × 1,350 × 2,400 mm · Weight: 2,600kg
Compliance UN38.3, IEC62477-1, IEC61000, IEC62619, IEC63056, UL9540A, EN50549
Warranty 10 years battery cell warranty

*Scalable: 1–6 cabinets per array (max 12) = 125kW to 750kW discharge · 260kWh to 1,560kWh storage · Up to 4 arrays for even higher capacity

Savings Calculator

Estimate your monthly savings

Move the sliders to see your potential TNB MD reduction. Based on TNB tariff of RM98.61/kW (Capacity + Network charges).

2,200 kW
25%
MD reduction
550 kW
Monthly saving
RM54,236
Annual saving
RM650,832
10-year value
RM6.51M

*Indicative figures only. Actual savings depend on site load profile, BESS sizing, and TNB tariff category. Contact Tanand for a site-specific assessment.